Phase Two – 2005
2003 saw the completion of the first section of Phase Two – a section of the outer loop – until funds and manpower were available to complete the remaining section and complete the loop. This required more manual labour to form the track bed through the wooded area, the installation of the bases for a 100ft, 5 section, girder bridge.